Lonesome
Pine Regional Business & Technology Park

STORMWATER
MANAGEMENT
The stormwater
conveyance system will consist of storm drain lines that will
follow all boulevards and service roads constructed during the
master plan development. Curb and gutter along the roads will
require curb drop inlets to be strategically located along the
roads. These inlets will tie into the storm drain lines, which
will also allow for ease of connection of drop inlets and roof
drains from various parcels when they are developed. An additional
storm drain line will run through the Town Center from State Route
723 to the western service road to collect runoff from the Town
Center. All storm drain lines installed during the master plan
development will be sized to adequately carry all runoff from
their respective drainage areas during all phases of the Park
development. The storm drain lines will likely outlet to one of
the two detention ponds in each of the recreation areas for erosion
and sediment control and to detain post-development peak runoff
rates to the pre-development values to protect downstream property.
|