STORMWATER MANAGEMENT

The stormwater conveyance system will consist of storm drain lines that will follow all boulevards and service roads constructed during the master plan development. Curb and gutter along the roads will require curb drop inlets to be strategically located along the roads. These inlets will tie into the storm drain lines, which will also allow for ease of connection of drop inlets and roof drains from various parcels when they are developed. An additional storm drain line will run through the Town Center from State Route 723 to the western service road to collect runoff from the Town Center. All storm drain lines installed during the master plan development will be sized to adequately carry all runoff from their respective drainage areas during all phases of the Park development. The storm drain lines will likely outlet to one of the two detention ponds in each of the recreation areas for erosion and sediment control and to detain post-development peak runoff rates to the pre-development values to protect downstream property.



 
© 2006 Wise County, Virginia. All Rights Reserved. Try our Guide to Services, County Directory or Search pages. 
206 East Main Street • Wise, Virginia 24293 • Phone: 276-328-2321 • Fax 276-328-9780. Privacy Policy
For suggestions, comments, or questions about this website, please contact our webmaster.
Designed WebWorx, Inc.